Due to renovation works at podium floor of Li Ka Shing Tower (Block M), students who need to leverage the computing facilities at Student Computer Centre (SCC) are required to take the lift to 3/F and walk up via stairs to 4/F SCC during renovation period.
1. Take the lift ‘G – 13’ to 3/F of Block M
2. Follow the instructions to the glass staircase and walk up to 4/F Student Computer Centre
Should you need further assistance to access SCC, please contact our IT HelpCentre (Tel: 2766 5900, WhatsApp/WeChat: 6577 9669).