Cohort 2023/24
IC Liaison Officer: LAU Chung-yin Johnny
Deputy: --
Scheme: BEng (Hons) Scheme in Civil Engineering and Sustainable Development
Programme Code: 31476 (4-Year)
Planned Intake: 128
Programme Title: BEng (Hons) in Civil Engineering
Programme Code: 31476-CE (4-Year)
Planned Intake: -
HKIE Accredited Programme: Y
Programme Title: BEng (Hons) in Environmental Engineering and Sustainable Development
Programme Code: 31476-ESD (4-Year)
Planned Intake: -
HKIE Accredited Programme: Y
Programme Title: BEng (Hons) in Civil Engineering (Structural & Fire Safety Engineering)
Programme Code: 31476-SFS (4-Year)
Planned Intake: -
HKIE Accredited Programme: Y
Programme Code | Subject Code | Subject Title | Subject Duration (Hrs) | Credit | Credit Type | Pre-requisite | Subject Content | Duration (Hrs) | Semester | Study Year | |
31476 | CSE2700 / IC2700 |
Construction Practices and Safety | 60 | 2 | Training | Nil | TM2009 |
Industrial Safety | 15 | S2 | Y1 |
TM7051 | Digital Construction Practices | 45 | S2 | Y1 | |||||||
31476-CE | CSE2701 / IC2701 | Construction Drawing and Modelling | 90 | 3 | Training | Nil | TM1270 | Building Information Modelling (BIM) Basics | 15 | S1 | Y2 |
TM1272 | Building Information Modelling (BIM) Structure | 15 | S1 | Y2 | |||||||
TM8020 | Construction Drawings | 27 | S1 | Y2 | |||||||
TM1277 | Advanced BIM Operation for BIM Manager | 33 | S1 | Y2 | |||||||
CSE2703 / IC2703 | Integrated Project and Quality Management | 90 | 3 | Training | CSE2701/IC2701 | TM1276 | Building Information Modelling (BIM) Management |
18 | S2 | Y2 | |
TM1280 | Modular Integrated Construction (MiC) |
15 | S2 | Y2 | |||||||
TM7363 | Construction Inspection |
21 | S2 | Y2 | |||||||
TM1268 | Integrative Project | 36 | S3 | Y2 | |||||||
31476-ESD | CSE2701 / IC2701 | Construction Drawing and Modelling | 90 | 3 | Training | Nil | TM1270 | Building Information Modelling (BIM) Basics | 15 | S1 | Y2 |
TM1272 | Building Information Modelling (BIM) Structure |
15 | S1 | Y2 | |||||||
TM8020 | Construction Drawings | 27 | S1 | Y2 | |||||||
TM1277 |
Advanced BIM Operation for BIM Manager |
33 | S1 | Y2 | |||||||
CSE2704 / IC2704 |
Integrated Project for
Environmental Control |
90 | 3 | Training | CSE2701/IC2701 | TM1276 | Building Information Modelling (BIM) Management |
18 | S2 | Y2 | |
TM1280 | Modular Integrated Construction (MiC) | 15 | S2 | Y2 | |||||||
TM7474 | Waste Management for Manufacturing |
21 | S2 | Y2 | |||||||
TM1268 | Integrative Project |
36 | S3 | Y2 | |||||||
31476-SFS | CSE2701 / IC2701 | Construction Drawing and Modelling | 90 | 3 | Training | Nil | TM1270 | Building Information Modelling (BIM) Basics | 15 | S1 | Y2 |
TM1272 | Building Information Modelling (BIM) Structure | 15 | S1 | Y2 | |||||||
TM8020 | Construction Drawings |
27 | S1 | Y2 | |||||||
TM1277 | Advanced BIM Operation for BIM Manager | 33 | S1 | Y2 | |||||||
CSE2705 / IC2705 |
Integrated Project for Fire Engineering |
90 | 3 | Training | CSE2701/IC2701 | TM1276 | Building Information Modelling (BIM) Management |
18 | S2 | Y2 | |
TM1280 | Modular Integrated Construction (MiC) | 15 | S2 | Y2 | |||||||
TM7475 | Structural Fire Safety |
21 | S2 | Y2 | |||||||
TM1268 | Integrative Project |
36 | S3 | Y2 |
Semester: Semester 1 = S1; Winter Break = WB; Semester 2 = S2; Semester 3 = S3; Summer Break = SB
Last Updated: August 2023