Revitalization of Jogging Track
The Jogging Track was completed in October 2020. The total length of the track is approximately 280m spanning from Shaw Sports Complex to Block X. Outdoor fitness equipment has also been provided along the jogging track.
![]() |
![]() |
![]() |
![]() |
Improvement Works to Classroom and Associated Cores
With the support and advice from the Working Group on Innovative Learning Space, an informal learning space was created at DE 4/F for self-study and group discussion in June 2020. The renovation works of 7nos. of associated Cores (C, D, E, F, G, H and J) were also completed in end of April 2021.
![]() |
![]() |
![]() |
![]() |
Teaching Rehabilitation Clinic at AG G/F
With the support of UGC, the Rehabilitation Clinic at AG G/F has been renovated to suit the latest teaching needs with new setup and equipment provisions. The works had been completed in end of August 2020 for operation.
![]() |
![]() |
![]() |
![]() |
Refurbishment and Replacement Works for School of Hotel and Tourism Management
The Bistro 1979 training restaurant and Vinoteca Lab on the B2 floor of SHTM were put for teaching use since the opening in 2011. However, the essential items had already been worn out after years of operation. The refurbishment and replacement works were carried out in Summer 2020 to upkeep the facilities in high standards that enable student learning in a realistic setting, meanwhile showcasing the state-of-the-art facilities of a world-class hospitality and tourism School. The project was completed in July 2020 for use by SHTM.
![]() |
![]() |
![]() |
![]() |
Other Completed Projects in 2020
Project Title | Location |
---|---|
A&A Works at HHB1706 in HKCC | HHB1706 |
A&A Works to CDO Office at Z521 | Z521 |
A&A Works to HTI at Block Y 6/F | Block Y 6/F |
A&A Works to RS Offices at QT518, QT526 and ST521 | QT518, QT526 & ST521 |
AP Laboratory Safety Improvement to FG707 | FG707 |
CEE Conversion of Language Centre into Theme-Based Research Laboratory at Z220 | Z220 |
Conversion of Research Office into Acoustic Laboratory at DE503 | DE503 |
Conversion of Research Staff Office into Laboratories at ST 8/F | ST 8/F |
Conversion to Occupational Therapy Clinical Service and Teaching Unit at W210 | W210 |
IC Revitalization Works on G/F & 1/F | Block W G/F & 1/F |
Installation of New Sculptures at Roof Garden at Block X | Block X Roof Garden |
ISE CAiRS Center | HKSTP 19W 12/F |
Phase 8 Portion A - MRI Laboratory | Phase 8 Portion A |
Relocation of ITC Laboratory from W102 to QT808 and QT808a | QT808 & QT808a |
Renovation of Washrooms in Core G | Core G |
Replacement of Fume Cupboard Exhaust Duct at Roof of Block Z | Block Z Roof |
Replacement of the Chiller Plant for Phase 6 Building | Phase 6 Roof |
Room modification to EF404 and 405 | EF404 & EF405 |
Swapping ZB215a with Z218, Z219 and Z284 for HTI Research Office | Z218, Z219 & Z284 |
Footbridge Linking Main Campus and Block Z
The construction of an iconic footbridge linking the Main Campus and podium level of Block Z has been completed. Apart from improving the pedestrian connectivity between the Main Campus and Block Z, the footbridge will also serve as a test bed for academic research activities and will form part of the cycle route envisioned in the long-term campus master plan. The footbridge is currently closed for execution of enhancement works and will be re-opened in due course.
![]() |
![]() |
Upgrading Exercise for Classrooms
With the support and advice from the Working Group on Innovative Learning Space, a total of 8 nos. of lecture theatres on 3/F of FJ and HJ wings and 3 nos. of classrooms on 4/F of DE wing have been renovated over the summer of 2019.
![]() |
![]() |
4/F of DE wing
![]() |
![]() |
3/F of FJ and HJ wings
Global Student Hub on P/F of QT Wing
To support the internationalization of student activities, a new one storey premises, Global Student Hub (GSH), has been constructed on the podium level of QT wing. With the new facility in place, student activities can take place at the hub to facilitate the exchange of different cultures and countries as well as establishment of different communities. GSH was completed in September 2019 and is scheduled for opening in the new academic year 2020/2021 tentatively.
![]() |
|
![]() |
![]() |
Lactation Room at Z213 & Z214
Great news to PolyU moms! Following the completion of lactation rooms at A213 in August 2017, we are happy to let you know that two additional lactation rooms have been established at Rooms Z213 and Z214 on 2/F of Block Z for female staff members starting from November 2019, which offer a private, safe and comfortable environment for nursing mothers in Block Z! For details of reservation, please visit https://www2.polyu.edu.hk/hro/breastfeeding/main.htm
![]() |
![]() |
![]() |
Food Laboratory and Animal Laboratory in Shenzhen Campus
To re-position Shenzhen Base as an extended campus in support for the University's growing development of research, entrepreneurship and educational activities, strengthen its capability in generating high-impact projects and bidding of large-scaled research funds in the Mainland, the research space in Shenzhen Campus in therefore expanded. Following the completion of Photonics Research Center on 3/F in May 2018, Food Laboratory on 6/F and Animal Laboratory on 7/F were completed in February 2019 and July 2019 respectively.
![]() |
![]() |
![]() |
Food Laboratory on 6/F
![]() |
![]() |
Animal Laboratory on 7/F
Other Completed Projects in 2019
Project Title | Location |
---|---|
A&A Works for BRE Learning & Teaching Open Laboratory | ZN707 |
A&A Works to AADO Office at Block M, 15/F |
Block M 15/F |
A&A Works to Block M, 16/F | Block M 16/F |
AS Lift Lobby Enhancement Works at Block M, 12/F | Block M 12/F |
CEE Improvement Works at ZB215 | ZB215 |
Central Multi-purpose Room at S508 | S508 |
Conversion of Existing Language Lab to FH VR Lab and RP Office at FG815 | FG815 |
Conversion of Room V1210 into a Constructive Learning Space | V1210 |
Enhancement Works for RS at GH206 | GH206 |
HKCC 2019 Summer Projects | HHB and WK |
Minor Improvement Works for Language Lab at FG816 | FG816 |
Renovation for PolyU Inno Hub | Inno Hub 4/F JCIT |
Renovation of Washrooms in Cores J and W | Core J & W |
Replacement of Existing Aire-cooled Chiller Plant with Water-cooled Type for Phase 1 and 2 Buildings | GH & HJ Roof |
Underpass Works - A&A Works at Pit A Area | Underpass - Pit A Area |
Upgrading Exercise for Classrooms
With the support and advice from the Working Group on Innovative Learning Space, a total of 8 classrooms on 3/F of CD, CF and EF wings have been renovated over the summer of 2018. In addition, an informal learning space has also been created for self-study and group discussion.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Alternations and Additions (A&A) Works on 4/F and 5/F Library
To address the imminent need, a number of enhancement works, including the increase in seating capacity, replacement of the existing aged building services installation works on 4/F and 5/F (triangular wing) had been completed in summer term 2018.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|
Provision of Passenger Lifts in Core C and D
Previously, there is only one passenger lift in the adjacent Cores E, F and J serving G/F to 7/F, but none in Core C or D. The new lifts in Cores C and D provide barrier free access to CD Wing via Cores C and D, thus improving the overall vertical transportation in Phase 1 building. The lifts are put into operation since July 2018.
![]() |
![]() |
Electronic Intelligence Workshop on 3/F in Core W and U
Upon completion of renovation works in March 2018, the Electronic Intelligence Workshop located on 3/F in Core W and U provides a flexible venue and equipped with up-to-date facilities to support teaching needs of various departments.
![]() |
|
![]() |
|
![]() |
![]() |
Photonics Laboratory in Shenzhen Campus
To re-position Shenzhen Base as an extended campus in support of the University's growing development of research activities, strengthen its capability in generating high-impact projects and bidding of large-scaled research funds in the mainland, the research space in Shenzhen Campus is therefore expanded. The construction of the 'Photonics Research Center' on 3/F of Shenzhen Base is one of the renovations involved, and has been completed in May 2018. The project has provided around 730m 2 of laboratory spaces including a large Photonics Lab with centralized facilities and a Class-10,000 clean room for research activities.
![]() |
![]() |
![]() |
![]() |
Other Completed Projects in 2018
Project Title | Location |
---|---|
A&A Works at Filtration Plant Room of Michael Clinton Swimming Pool | Michael Clinton Swimming Pool |
A&A Works for IC at W401j Design Realization Studio | W401j |
A&A Works to OP at Block M, 16/F and 17/F | M1602, M1701, M1702 & M1704 |
A&A Works to Y512 and Y513 | Y512 & Y513 |
DISI Projects at Block V, 12/F | Block Y 12/F |
A&A Works at Block X, G/F ASRC | X041 |
BME Conversion of Washrooms and Office into Laboratory at Y505, Y506, YY506 and YY507 | Y505, Y506, YY506 & YY507 |
Central Chemical Handing Depot in U203 and U205-M and Associated Works to W207a and W311c | U203, U205-M, W207a & W311c |
Centre STAR Office Consolidation Renovation at TU302 and TU304 | TU302 & TU304 |
Conversion of QT523 into Office for Clinical Teaching Staff | QT523 |
A&A Works for EIE at DE502 | DE502 |
Establishment of BME Smart Ageing Hub at GH042 and GH042a | GH042 & GH042a |
HTI Laboratories Expansion and Associated Works at Block Y, 10/F and Core U, 5/F | Block Y 10/F & Core U 5/F |
Improvement Works to ASRC X041 Door Entrance | X041 |
Installation of Sculpture at JCA | JCA |
Installation of Signage for FCE at Phase 8, G/F | Block Z G/F |
ME Renovation of Laboratory Space for Biomechanics Lab at GH033c | GH033c |
OUS Consolidation at TU409 and TU409a | TU409 & TU409a |
Renovation and Drainage Re-diversion of Washrooms at MN 1/F | MN 1/F |
Renovation Works for Existing Toilets at S204 to S206 | S204 - S206 |
Renovation Works for XB01 for Library | XB01 |
Replacement of Existing Chiller Plants for Phases 2A and 2B Buildings | FG & GH Roof |
Research Laboratory at ZB223 to ZB225 | ZB223 - ZB225 |
Swap HJ211 with W203 and Extend Use of HJ211 | HJ211 & W203 |
Redevelopment of Block X
The Redevelopment of Block X comprises a low rise sustainable building with workshops and offices for the Aviation Services Research Centre, a 25-meters long all weather indoor swimming pool, 5-a-side indoor football pitch, indoor gymnasium and communal student facilities. It will also provide landscaped recreational space and serve as a circulation hub for the main campus. The project has been completed in the summer of 2017.
![]() |
![]() |
![]() |
![]() |
Upgrading Exercise for Classrooms
With the support and advice from the Working Group on Innovative Learning Space, a total of 8 classrooms on 2/F and 3/F of BC wing have been renovated over the summer of 2017. In addition, an informal learning space has also been created for self-study and group discussion.
![]() |
![]() |
![]() |
![]() |
Alternations and Additions (A&A) Works on 4/F and 5/F Library
To address the imminent need, a number of enhancement works, including the increase in seating capacity, replacement of the existing aged building services installation works on 4/F and 5/F (rectangular wing) had been completed in September 2017.
![]() |
![]() |
![]() |
![]() |
Lactation Room at A213
Great news to PolyU moms! Two new lactation rooms were established at A213 for female staff members since August 2017. After registration, colleagues can now perform lactation in a private, safe and comfortable environment. For reservation details, please visit https://www2.polyu.edu.hk/hro/breastfeeding/main.htm
![]() |
![]() |
![]() |
Toilet Renovation
The traditional toilets within Cores Q, T, U and S have been renovated and improved its faculties and infrastructure, with completion in October 2017. The work contains replacement works of existing finishes, brick wall partition, sanitary fitment and ventilation system etc.
![]() |
![]() |
Other Completed Projects in 2017
Project Title | Location |
---|---|
A&A Works at PQ609 | PQ609 |
A&A Works at U503 to U507 | U503 - U507 |
A&A Works for National Rail Transit at Z105 | Z105 |
A&A Works for Steel Construction at Z106 | Z106 |
A&A Works for AS Services Centre at M102 and M103 | M102 & M103 |
A&A Works to Chemical Lab at Y1306, 1306a and 1306b | Y1306, Y1306a & Y1306b |
A&A Works to Block M, 18/F | Block M 18/F |
A&A Works to Offices at QR808 and QR809 | QR808 & QR809 |
A&A Works for HKCC at WKN1102 | HKCC WKN1102 |
A&A Works for AAE Labs at QT004a and QT004b | QT004a & QT004b |
A&A Works for ABCT Lab at U003 and U003a | U003 & 003a |
A&A Works for COMP at PQ815 and PQ820 | PQ815 & PQ820 |
A&A Works for ITS Office at Block Z, 2/F and Block ZS, 4/F | Block Z 2/F & ZS 4/F |
A&A Works for Language Lab at FG703 and GH705 | FG703 & GH705 |
A&A Works to CEE Rock Lab Extension at Block Z, LG2/F | Block Z LG2/F |
A&A Works to EF501 | EF501 |
A&A Works to Laboratory for Y413 and Y414 | Y413 & Y414 |
A&A Works to RS Labs at BC 5/F | BC 5/F |
AADO Signage Installation for SHTM | SHTM |
Advanced Materials Lab Renovation Works at CF717 to CF718 | CF717 - CF718 |
Alteration Works in EE Labs at EF G/F and 1/F | EF G/F & 1/F |
AP Labs Renovation Work at FG707, FG707a to FG707d, and GH712 to GH714 | FG707, FG707a - d & GH712 - 714 |
AP Renovation Works for BC614 | BC614 |
AP Renovation Works for CD626 to CD628 | CD626 - CD628 |
CBS Interactive Chinese Learning Centre at Z214 | Z214 |
CDO A&A Works at Z502 | Z502 (Z521) |
Conversion from Classroom to Biological Research Laboratory at Y503 | Y503 |
Design and Build for Gondola System for WK | HKCC (WK) |
Enhancement Works for Kiosk at Block W Podium | Block W P/F |
Extension of Administration Office at QT511, QT512 and QT512a | QT511, QT512 & QT512a |
FCE Hot Desk for RP office at ZB215 | ZB215 |
HTI Laboratories Expansion and Associated Works at Block Y, 9/F and 11/F, GH G/F and Block Z, 1/F |
Block Y 9/F & 11/F, GH G/F & Block Z 1/F |
Installation of Sculptures to Parapet Wall at Lawn Area Next to Alumni Hall, Core A | Lawn A P/F |
ITC Ventilation Modification Works at W601 to W606 | W601 - W606 |
LSGI Smart City Laboratory Renovation Works at ZN607 and ZN608 | ZN607 & ZN608 |
New Glass Canopy at Lawn Café | Lawn Café |
Office Consolidation at 3/F of QT and ST Wing | QT & ST 3/F |
Provision of Independent Chiller Operation for an University Cleanroom at HJ 7/F | HJ 7/F |
Renovation of Intensive Care Lab at FJ501, FJ501b, FJ501c and FJ501d | FJ501, FJ501b, FJ501c & FJ501d |
Renovation of Research Student Office at EF313, EF313a and EF314 | EF313, EF313a & EF314 |
Renovation Work for 3/F North Wing, WK | WK North Wing 3/F |
Reorganization of ITC Workshops at MN G/F | MN G/F |
Soundproof Improvement Works for ITDO Meeting Room at GH255 | GH255 |
SPEED Logo for PolyU Hung Hom Bay Campus | External Wall HKCC Campuses |
Supply and Installation of Paintings at P/F, LKST | LKST P/F |